Looking for suggestions on workflow (re: projects and their references)
Posted: Mon Jun 03, 2019 8:28 am
Hello,
I'm trying to set up a new, more convenient, workflow re: my projects and references used on each project.
Until now I had several static groups, each with several references. However, I cannot easily know which are the references I use the most. Plus, my leftmost pane is getting crowded with all kinds of groups.
I thought about using keywords for this (ex. pj-2018-pub-hto, pj-2019-pos-lve, pj-2019-pre-cbc...), but that would mean mingling purposes (in each reference I have a set of keywords to contextualize the reference: e.g. holocene, biogeography, europe, vegetation).
Since I cannot find best way to do this, maybe someone can share how is doing this. Are you using any of the above methods (static groups or keywords)? Are you using one of the Field Labels? Any other method?
Best,
/mjvalente
I'm trying to set up a new, more convenient, workflow re: my projects and references used on each project.
Until now I had several static groups, each with several references. However, I cannot easily know which are the references I use the most. Plus, my leftmost pane is getting crowded with all kinds of groups.
I thought about using keywords for this (ex. pj-2018-pub-hto, pj-2019-pos-lve, pj-2019-pre-cbc...), but that would mean mingling purposes (in each reference I have a set of keywords to contextualize the reference: e.g. holocene, biogeography, europe, vegetation).
Since I cannot find best way to do this, maybe someone can share how is doing this. Are you using any of the above methods (static groups or keywords)? Are you using one of the Field Labels? Any other method?
Best,
/mjvalente